Succesful launch of Hall D
March 2010

Wednesday March 10 Toulouse Blagnac Airport launched it’s new terminal, Hall D. It was a successful opening, with the first flight operated by ...

The official opening of the Hall D
January 2010

On 21 January, the official opening of Hall D was a dazzling event. It was attended by the region's leading figures...

• Hall D in figures > New facilities

New facilities

 

  • 8 aircraft bays, including 4 with walkways (and up to a possible 8)
  • 12 check-in desks (and up to a possible 24)
  • 8 inspection and screening stations (security inspections)

 

 

 

 

 

Hall D, D comme Découvrir le monde Accéder au site de l’Aéroport Toulouse Blagnac English